Category:Dyson Sphere Program Wiki and File:DSP Build Tracker and Item List.xlsx: Difference between pages

Category page
(Difference between pages)
imported>76561198045853337
(Created blank page)
 
imported>76561198121518784
 
Line 1: Line 1:
== Summary: ==
A workbook that will allow you to keep easy tracking of your production.  It has auto formatting and does all the hard work for you - you just need to tell it your progress by entering a "Y" in the "master" sheet and all sub-sheets will auto update.


== How to use this Workbook: ==
As you produce each item mark it in Column B with a "Y" on the "Master" sheet.
Once the item is in the intra-planetary storage network mark it in Column C with a "Y" on the "Master" sheet.
Once the item is in the inter-planetary storage network mark it in Column D with a "Y on the "Master" sheet.
When an item is marked as being in the planetary storage it will be marked as available withing each production sheet, this will let you see if you have the base component available to create the target product.
When an item is marked as being produced and both storage types it will be marked green.
There is no need to update the production sheets as the master sheet will update these automatically, however you can add any specific notes for that production chain on the sub-sheet.
Formulas and formatting are currently applied down to row 200 to allow for some expansion as the game grows.
Products are all sorted aplhabetically and any furure ones can be inserted as needed.
== Changelog: ==
14/02/21: v1.0:  Initial layout
18/02/21: v1.1:  Added a missing item
Added times to produce each item (this will be updated shortly to calculate times depending on assembler version speed)
Added links for each item to its corresponding wiki page(only on master sheet so far - sub-sheets may be done later)
== Upcoming: ==
I would like to add the required quantities.
I would like to add a production calc that will work out how many you are producing and how much is required so you know
if you are meeting the production requirements or over/under producing.
I will look into a google sheets version - but as I'm not so familiar with this it may take a bit - especially with the formatting/formulas.
== Requests & Feedback: ==
Please feel free to let me know any changes you would like to see in future versions as well as any bugs if you find them(hopefully there are none! :p)
I can be reached at: classified_one at hotmail dot com - Please put "DSP Tracker" in your subject so that your email doesn't get flung into junk!
====== THERE ARE NO MACRO's IN THIS WORKBOOK - ALL THE FORMATTING IS DONE WITH FORMULAS AND CONDITIONAL FORMATTING ======

Revision as of 01:34, 18 February 2021

Summary:

A workbook that will allow you to keep easy tracking of your production. It has auto formatting and does all the hard work for you - you just need to tell it your progress by entering a "Y" in the "master" sheet and all sub-sheets will auto update.

How to use this Workbook:

As you produce each item mark it in Column B with a "Y" on the "Master" sheet.

Once the item is in the intra-planetary storage network mark it in Column C with a "Y" on the "Master" sheet.

Once the item is in the inter-planetary storage network mark it in Column D with a "Y on the "Master" sheet.


When an item is marked as being in the planetary storage it will be marked as available withing each production sheet, this will let you see if you have the base component available to create the target product.

When an item is marked as being produced and both storage types it will be marked green.


There is no need to update the production sheets as the master sheet will update these automatically, however you can add any specific notes for that production chain on the sub-sheet.

Formulas and formatting are currently applied down to row 200 to allow for some expansion as the game grows.

Products are all sorted aplhabetically and any furure ones can be inserted as needed.

Changelog:

14/02/21: v1.0: Initial layout

18/02/21: v1.1: Added a missing item

Added times to produce each item (this will be updated shortly to calculate times depending on assembler version speed)

Added links for each item to its corresponding wiki page(only on master sheet so far - sub-sheets may be done later)

Upcoming:

I would like to add the required quantities.

I would like to add a production calc that will work out how many you are producing and how much is required so you know if you are meeting the production requirements or over/under producing.

I will look into a google sheets version - but as I'm not so familiar with this it may take a bit - especially with the formatting/formulas.

Requests & Feedback:

Please feel free to let me know any changes you would like to see in future versions as well as any bugs if you find them(hopefully there are none! :p)

I can be reached at: classified_one at hotmail dot com - Please put "DSP Tracker" in your subject so that your email doesn't get flung into junk!

THERE ARE NO MACRO's IN THIS WORKBOOK - ALL THE FORMATTING IS DONE WITH FORMULAS AND CONDITIONAL FORMATTING

Subcategories

This category has the following 4 subcategories, out of 4 total.

D

W

🍪 We use cookies to keep session information to provide you a better experience.