category
imported>76561197971023681 (formatting, Soil pile is limited to one billion.) |
imported>76561198045853337 (category) |
||
Line 5: | Line 5: | ||
Soil pile is consumed when you place [[Foundation]] or a Building in an area lower than the "level" terrain height. If you do not have sufficient soil pile in your mecha's storage, the game will warn you and not permit you to place the Foundation or Building. | Soil pile is consumed when you place [[Foundation]] or a Building in an area lower than the "level" terrain height. If you do not have sufficient soil pile in your mecha's storage, the game will warn you and not permit you to place the Foundation or Building. | ||
[[Category:Dyson Sphere Program]] |